Phase 1 is the System Requirement Study so as to produce:
- The DAE, a document resulting from the analysis of the existing code, based on the sources supplied by the Client
- The DAC, a document detailing the conclusions reached jointly with the Client for the target architecture
These documents detail the scope of the migration project, the technical means of migration and the chosen target.
With these elements, SOFTMAINT is in a position to establish the migration dossier.
This dossier is the starting point for the industrialisation phase.